Full Text
<h1><span style="font-family: Calibri, sans-serif;">Introduction</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Urban transportation infrastructure is widely recognized as the circulatory system of modern economies, facilitating the efficient movement of labor, goods, and services. In rapidly urbanizing regions, particularly in developing nations, investments in mass transit systems are deemed essential to decongest cities, reduce travel times, and stimulate economic growth (World Bank, 2017). However, the delivery of these megaprojects is notoriously fraught with challenges. Flyvbjerg (2014) established the “Iron Law of Megaprojects,” positing that such initiatives are systematically biased toward over-budgeting, over-promising benefits, and under-delivering. While technical complexities and geophysical constraints contribute to these failures, in developing economies, the primary catalyst for project failure and eventual abandonment is overwhelmingly rooted in financial mismanagement (Oseghale et al., 2021).</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Project abandonment remains a pervasive socio-economic malaise in developing countries, representing a severe misallocation of scarce public resources. Financial mismanagement within this context encompasses a broad spectrum of fiscal improprieties, including rampant corruption, deliberate contract inflation, lack of transparent procurement processes, diversion of project funds, and severe inadequacies in initial financial feasibility studies (Ewa et al., 2018). When funds meant for project execution are syphoned or poorly allocated, it triggers a vicious cycle of cost overruns, delayed contractor payments, work stoppages, and ultimately, the abandonment of the project. The consequences are devastating: urban landscapes are left scarred by uncompleted structures, public trust in governance is eroded, and the intended socio-economic dividends of the infrastructure are entirely lost (Idoro, 2020).</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">A quintessential illustration of this phenomenon is the Rivers State Monorail project in Port Harcourt, Nigeria. Conceived in the early 2010s by the state government, the Rivers Monorail was heralded as a transformative urban transit solution aimed at easing the crippling traffic congestion in Port Harcourt, the nerve center of Nigeria's oil and gas industry. It was marketed as the first monorail system in Sub-Saharan Africa, designed to link key commercial and residential hubs. However, after billions of Naira were expended — far exceeding initial budgetary estimates — the project ground to a halt. Today, it stands as a skeletal network of concrete pillars stretching across the city, widely characterized by locals and urban planners as a “monument of shame” (Sotubo, 2020).</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The trajectory of the Rivers Monorail from an ambitious urban solution to an abandoned white elephant provides a critical lens through which to examine the specific mechanics of financial mismanagement. Investigations and subsequent reviews by succeeding administrations revealed alarming financial discrepancies. These included the alleged inflation of contract sums, the awarding of contracts without standard due diligence, the failure to secure committed funding for subsequent project phases before commencing construction, and the misappropriation of funds allocated for right-of-way compensation and civil works (Rivers State Government, 2019). The financial hemorrhage associated with the project meant that by the time the fundamental structural pillars were erected, the state treasury was depleted, and there were no remaining funds to procure the rolling stock (the trains) or build the stations, rendering the infrastructure fundamentally useless. While extensive literature exists on the general causes of project abandonment in Nigeria, there is a distinct gap in empirical case-study research that isolates and meticulously traces the sequential impact of specific financial mismanagement practices on the lifecycle of urban transport megaprojects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Analyzing the Rivers Monorail through this specific financial lens moves the discourse beyond generic narratives of “corruption.” It highlights how the weaponization of public finance in megaproject execution directly translates into physical abandonment, thereby exacerbating urban mobility crises. Therefore, this study seeks to analyze the effect of financial mismanagement on abandoned urban transport projects, utilizing the Rivers Monorail as a definitive case study. By deconstructing the fiscal decisions, procurement irregularities, and budgetary failures that plagued the project, this research aims to establish a clear causal link between financial governance and infrastructure viability. Ultimately, understanding the financial anatomy of the Rivers Monorail's failure is imperative for policymakers, urban planners, and anti-corruption agencies to design robust fiscal safeguards that prevent the recurrence of such catastrophic infrastructural waste in developing urban centers.</span></p><h1><span style="font-family: Calibri, sans-serif;">Statement of the Problem</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Despite the critical need for modern urban mass transit systems to decongest rapidly growing cities in developing nations, a significant number of these infrastructure megaprojects suffer premature abandonment, resulting in colossal economic waste and worsening urban mobility crises. The Rivers State Monorail project in Port Harcourt, Nigeria, stands as a glaring manifestation of this issue. Initially conceived as a transformative solution to the city's severe traffic gridlock and slated to be Sub-Saharan Africa's first monorail system, the project has been completely abandoned. Today, it exists merely as a network of dormant concrete pylons dissecting the city skyline, representing billions of Naira in sunk costs with zero operational utility.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">While infrastructural failures in developing economies are often attributed to a complex mix of political instability, technical deficiencies, and community resistance, empirical evidence and preliminary audits indicate that the primary catalyst for the Rivers Monorail's demise was systemic financial mismanagement. This encompasses a spectrum of fiscal malpractices, including the severe inflation of contract sums, failure to conduct realistic financial feasibility studies, diversion of project funds, and the commencement of construction without secured, phased financing (Rivers State Government, 2019). However, the fundamental problem extends beyond the mere occurrence of these fiscal improprieties; it lies in the lack of a granular, empirical understanding of how and to what extent specific financial mismanagement mechanisms directly translate into the physical abandonment of complex urban transport systems.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Currently, existing literature on project abandonment in Nigeria tends to treat financial mismanagement as a monolithic concept — often generalized simply as “corruption” — without dissecting the sequential impact of distinct financial failures. There is a critical knowledge gap regarding how poor initial budgeting leads to contractor default, how the lack of financial oversight triggers work stoppages mid-project, and how the mismanagement of compensatory funds creates socio-legal bottlenecks that ultimately paralyze project delivery. Because the specific financial anatomy of the Rivers Monorail's failure has not been rigorously isolated and analyzed, urban planners, policymakers, and anti-graft agencies are left relying on generalized assumptions rather than targeted, evidence-based insights.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The consequence of this knowledge gap is profound. Without a precise understanding of the financial mismanagement dynamics that killed the Rivers Monorail, Port Harcourt remains saddled with abandoned infrastructure, unmitigated traffic congestion, and a massive burden on public trust. Furthermore, state and local governments remain highly vulnerable to repeating these exact fiscal errors in future transport initiatives, such as Bus Rapid Transit (BRT) systems or light rail projects. Therefore, the problem this study addresses is the critical lack of a detailed, case-specific analysis tracing the direct effect of financial mismanagement practices on the abandonment of the Rivers Monorail. This study seeks to move the discourse beyond generic narratives of corruption by systematically analyzing how specific fiscal failures — from procurement inflation to funding discontinuity — structurally paralyzed the project, thereby providing a necessary framework to prevent future fiscal hemorrhage in urban transport infrastructure delivery.</span></p><h1><span style="font-family: Calibri, sans-serif;">Objective of the Study</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The main objective of this study is to examine the effect of financial mismanagement on abandoned urban transport projects, using the Rivers Monorail as a case study. The specific objectives were to:</span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>i. </strong>Examine the effect of Financial Reporting Misconduct on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>ii. </strong>Evaluate the effect of Internal Control on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Hypotheses of the Study</em></strong></span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>i. </strong>Financial Reporting Misconduct has no significant effect on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>ii. </strong>Internal Control has no significant effect on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><h1><span style="font-family: Calibri, sans-serif;">Conceptual Review</span></h1><p><span style="font-family: Calibri, sans-serif;"><strong><em>Financial Mismanagement</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Financial mismanagement is the inefficient, ineffective, and unethical use of the public's money. Some of the main signs of financial mismanagement include spending money unlawfully, irregularly, without results, and wastefully (Mabunda et al., 2023). For developing countries such as South Africa, the major problem with the provision of public services and the growth of their economy lies in financial mismanagement (Makanyeza et al., 2018). Reports from the Auditor-General of South Africa usually mention poor financial discipline, violation of procurement procedures, and poor internal control measures within different departments, especially at the level of provinces and municipalities (Auditor-General South Africa [AGSA], 2023). In rural development departments, apart from diverting funds away from the purpose of development and wasting time, financial mismanagement affects public confidence in project implementation. Moreover, another problem related to project implementation in rural development areas is poor leadership and political intervention, which make the situation even more complicated due to low accountability (Glasser & Wright, 2020).</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">According to the International Federation of Accountants (2021), public financial management systems are key to ensuring accountability, transparency, fiscal discipline, and efficiency in service delivery. Financial mismanagement leads to corruption, fraudulent practices, and wastage of resources, making the government unable to provide important services to its citizens. As per the Organization for Economic Co-operation and Development (2023), financial mismanagement involves managing public resources in an opaque manner without considering accountability or value-for-money. Financial mismanagement contributes to budget deficits, poor infrastructure development, loss of investor confidence, and loss of public confidence in government institutions. Good governance therefore calls for proper financial management systems accompanied by internal controls and audit processes. Poor corporate governance, lack of transparency, politics, inefficient oversight institutions, corruption, and poor enforcement of financial regulations are other factors that result in financial mismanagement (Mikesell, 2018).</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Financial Reporting Misconduct</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Financial reporting misconduct involves the distortion, misrepresentation, manipulation, omission, or misstatement of any form of financial information contained in an organization's financial statements. Financial reporting misconduct decreases the credibility of financial statements, creates a lack of trust among investors, and diminishes the role of corporate governance (Dechow, Ge, & Schrand, 2010). According to Needles, Powers, and Crosson (2019), financial reporting misconduct happens when the manipulation of financial information is done intentionally to meet the objectives of management. It reduces the quality of financial reporting information and its value in the decision-making process. Financial reporting misconduct may occur in both public and private organizations. In corporate organizations, management may distort financial statements to increase stock value, secure loans, attract investors, save taxes, or receive performance-based compensation. In the public sector, financial reporting misconduct may occur through the cover-up of budget deficits, improper expenditure, misclassification of government funds, and incorrect reporting of government income and expenditure.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">There are severe economic and organizational implications associated with financial reporting impropriety, given its impact on investment decision-making, investor confidence, market valuation, penalties, reputation, bankruptcy, and financial instability. Large-scale accounting scandals have illustrated how false financial information can wipe out shareholders' wealth and undermine the efficiency of financial markets. Furthermore, such scandals have shown how financial reporting misrepresentation shakes confidence in the accounting profession (Healy & Palepu, 2001). The demise of corporations due to financial reporting fraud has prompted regulatory bodies worldwide to tighten accounting standards, audits, and governance requirements. To prevent financial reporting misconduct, companies should ensure well-developed internal control mechanisms, independent audit committees, proper corporate governance structures, whistle-blower programmes, external audits, and adherence to accounting standards.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Internal Control</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Internal control entails the policies, procedures, systems, and processes established within an organization to safeguard assets, ensure the integrity and accuracy of financial information, increase operational efficiency, comply with laws and regulations, and achieve organizational objectives. Internal control is regarded as the most important process organizations use to ensure effective financial management and corporate governance (Arens, Elder, & Beasley, 2020). According to Messier, Glover, and Prawitt (2022), internal control involves coordinated policies and procedures put in place to ensure proper authorization, recording, and documentation of financial transactions. These controls provide assurance of asset protection from fraud, theft, or misappropriation, as well as accurate financial reporting. An organization's failure to establish effective segregation of duties, authorization, documentation, and supervision exposes it to greater risks of fraud, corruption, and financial manipulation. Employees may exploit weaknesses in internal control processes to misappropriate assets, commit fraud, or conceal financial irregularities (Hayes, Dassen, Schilder, & Wallage, 2020).</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">In the public sector, internal control ensures effective management of public finances and greater transparency in government financial administration. Internal control is vital because it ensures that expenses incurred by government are consistent with budgeted estimates, procurement processes, and financial management rules. It also helps ensure accountability by providing useful information for financial analysis and auditing. Organizations with strong internal controls therefore tend to be more effective in delivering high-quality public services (INTOSAI, 2019). Modern organizations use accounting packages, ERP systems, electronic approval systems, automatic reconciliations, and electronic audit trails to implement internal controls. The introduction of technology has increased the effectiveness of internal controls by reducing the time spent, increasing accuracy, and reducing errors and fraudulent actions (Hall, 2019). Organizations therefore need to continually evaluate their internal controls to ensure they meet emerging risks.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Abandoned Urban Transport Projects</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Abandoned urban transport projects refer to transport infrastructure projects that are initiated but subsequently abandoned, deferred, or not completed before reaching their intended objectives. This category includes roads, railroads, metros, monorails, Bus Rapid Transit (BRT) systems, bridges, and other mobility infrastructure that fail to be completed due to financial, administrative, political, technical, or institutional constraints. The abandonment of projects leads to loss of public funds and hinders urban development, productivity, and the quality of life of city inhabitants (Meredith, Shafer, & Mantel, 2022). Project abandonment, according to Kerzner (2022), entails the indefinite suspension of the implementation process, making it impossible to reap the intended economic and social benefits of the project. Urban transport projects aim to improve the mobility of people, reduce traffic congestion, aid economic activities, facilitate environmental sustainability, and enhance access to opportunities such as employment, health care, and educational institutions. The United Nations Human Settlements Programme (2022) argues that sustainable urban transport systems are vital to inclusive urban development, as they lead to enhanced connectivity, reduced travel costs, improved environmental quality, and economic growth.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">According to Yescombe (2018), for large infrastructure projects to be implemented successfully, there should be sustainable financing models, efficient risk management, and transparent procurement processes. In the absence of these mechanisms, projects usually encounter delays, rising construction costs, insufficient funding, and, ultimately, abandonment. Efficient financial governance is therefore a critical tool for ensuring project continuity. Where governments have a history of failing to implement infrastructure projects, investors lose confidence in their ability to deliver, potentially discouraging future domestic and international investment in infrastructure development (World Bank, 2023). Current project management literature stresses that avoiding project abandonment calls for feasibility studies, realistic budgeting, effective stakeholder management, efficient internal controls, transparent procurement, constant project monitoring, and sound financial management. Organizations are encouraged to adopt international project management practices throughout the project cycle, from conception to completion (Nicholas & Steyn, 2020).</span></p><h1><span style="font-family: Calibri, sans-serif;">Theoretical Framework</span></h1><p><span style="font-family: Calibri, sans-serif;"><strong><em>Institutional Theory</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Institutional Theory was originally formulated by Meyer and Rowan (1977) and later developed further by DiMaggio and Powell (1983). This theory explains how organizations are affected by the institutional environment in which they operate. It assumes that organizations operate under the influence of institutions and are not isolated from the outside world, due to the presence of formal rules, regulations, social norms, cultural expectations, and governance structures. Organizations that comply with these institutional pressures are more likely to obtain legitimacy, increase their effectiveness, and ensure long-term performance. As stated by Meyer and Rowan (1977), organizations adopt formal structures and practices not only to become more efficient but also to obtain legitimacy from stakeholders, including governments, regulatory authorities, shareholders, and other constituencies. Legitimacy increases organizations' credibility, provides them with stakeholder support, and helps them survive. Conversely, when organizations violate institutional standards, they are exposed to problems of poor governance, financial mismanagement, and inefficiency.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">DiMaggio and Powell (1983) state that organizations face three types of institutional pressures: coercive, normative, and mimetic. Coercive pressures arise from governmental rules, laws, and policies that compel organizations to meet financial and legal reporting requirements. Normative pressures emanate from professional standards and ethics set by professional bodies and regulatory institutions. Mimetic pressures arise when organizations copy the structural practices of successful organizations in response to uncertainty or environmental challenges. Institutional Theory highlights the importance of efficient governance systems for sound financial management. Strong institutions provide clear regulations on finances, procurement practices, accountability measures, internal controls, audits, and supervision systems that facilitate transparency and prudent management of public finances. Weak institutions, on the other hand, can lead to corruption, improper financial reporting, abuse of public funds, and project failure (Scott, 2014). Where these institutional practices are weak, public projects become vulnerable to financial mismanagement, overpricing, diversion of funds, political manipulation, implementation delays, and eventual abandonment (North, 1990).</span></p><h1><span style="font-family: Calibri, sans-serif;">Empirical Review</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Dechow, Sloan, and Sweeney (1996) conducted research to establish the attributes of corporations that engage in fraudulent financial statements in the United States. Using logistic regression analysis on public companies, they found that poor corporate governance and weak financial management greatly increased the likelihood of financial misconduct.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Rezaee (2005) examined the drivers and effects of financial statement fraud through an extensive study of corporate accounting fraud cases. The study established that manipulating financial statements undermined investor confidence, decreased corporate credibility, and led to financial collapse.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Ashbaugh-Skaife, Collins, Kinney, and LaFond (2008) analyzed the impact of internal control failures on economic outcomes. Through panel data analysis, they found that corporations with sound internal control demonstrated improved financial performance, reduced operational risk, and increased investor confidence, concluding that good internal control systems play a major role in organizational sustainability.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Feng, Li, and McVay (2009) sought to establish whether improvements in internal control led to better financial reporting. Using long-term financial data from U.S.-based companies, they found that corporations that improved their internal control systems experienced improved financial reporting and fewer accounting anomalies, and recommended continuous evaluation of internal control systems.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Cantarelli, Flyvbjerg, Molin, and van Wee (2012) examined cases of cost overruns in infrastructure transport projects in Europe. Through comparative analysis, they determined that financial mismanagement, cost miscalculations, ineffective governance, and politics were among the main reasons behind incomplete and unfinished infrastructure projects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Doloi, Sawhney, Iyer, and Rentala (2012) conducted an empirical study examining the reasons for infrastructure project failures in India using structural equation modelling. The study revealed that financial management, delayed payments, contract management, and institutional capacity were highly influential factors.</span></p><h1><span style="font-family: Calibri, sans-serif;">Methodology</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">This study adopted a descriptive research design to examine the effect of financial mismanagement on abandoned urban transport projects. The study was conducted in Port Harcourt, Rivers State, Nigeria, with specific emphasis on the Rivers Monorail project. The study utilized primary data collected through a structured questionnaire administered to respondents directly involved in or knowledgeable about the Rivers Monorail project. The target population comprised personnel and staff who are experts in public and private sector organizations in Nigeria, including the civil service and government parastatals of all categories. The sample size for the study consisted of 208 personnel/staff drawn from eleven public/private sector organizations in Nigeria. The questionnaire was developed based on relevant questions identified in the study and ideas drawn from the literature review.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The questionnaire was divided into two sections, “A” and “B.” Section A elicited information on demographic characteristics such as age, sex, department, experience, and qualification. Section B contained a total of 18 questions designed to elicit information on Financial Reporting Misconduct, Internal Control, and Abandoned Urban Transport Projects, using a five-point Likert scale comprising Strongly Agree (SA), Agree (A), Undecided (UN), Disagree (D), and Strongly Disagree (SD). Validity refers to the extent to which the research instrument measures what it is intended to measure; to ensure validity, the researcher employed face and content validity. The reliability of the instrument was established using the test-retest method, whereby copies of the questionnaire were distributed to respondents from the sampled units, collected, and redistributed a second time to verify consistency. The Cronbach's alpha test coefficient was used to determine reliability, yielding a coefficient of 0.747, above the required threshold of 0.7, confirming the reliability of the outcome. Data collected were coded and analysed using simple percentages and chi-square analysis in Statistical Package for Social Sciences (SPSS) Version 28.0.</span></p><h1><span style="font-family: Calibri, sans-serif;">Data Presentation and Analysis</span></h1><p><span style="font-family: Calibri, sans-serif;"><strong><em>Demographic Presentation and Descriptive Statistics</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The tables, percentages, means, and standard deviations below represent the profile of the respondents, as shown in Table 1.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong>Table 1: Demographic Profile of the Respondents</strong></span></p><table style="min-width: 100px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Characteristic</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Category</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Frequency</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Percentage</strong></span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Gender</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Male</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">108</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">55%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Gender</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Female</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">89</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">45%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Age</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">18–24</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">6%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Age</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">25–34</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">46</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">23%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Age</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">35–44</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">66</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">34%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Age</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">45–54</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">43</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">22%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Age</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">>55</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">31</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">16%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Department</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Audit</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">53</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">27%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Department</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Account</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">56</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">28%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Department</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Management</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">73</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">37%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Department</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Human Resource</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">15</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">8%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Experience</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">< 2 years</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">63</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">32%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Experience</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">2–5 years</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">68</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">35%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Experience</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">6–9 years</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">39</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">20%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Experience</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">> 10 years</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">27</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">14%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Academic Qualification</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">PhD</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">21</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Academic Qualification</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">M.Sc.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">42</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">21%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Academic Qualification</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">B.Sc./HND</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">96</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">49%</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Academic Qualification</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Secondary</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">38</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">19%</span></p></td></tr></tbody></table><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;">From Table 1, 55% of participants were male (108) and 45% were female (89); more males participated in the research than females. The majority of participants were between 35 and 44 years old, accounting for approximately 34% (66), followed by the 25–34 age group at approximately 23% (46). Participants aged 45–54 accounted for approximately 22% (43), while those above 55 years accounted for approximately 16% (31). Participants aged 18–24 accounted for about 6% (11) of the sample. Most participants were from the management department, at approximately 37% (73), followed by 28% (56) from the accounting department and 27% (53) from the audit department; more participants were drawn from management departments across the public/private sector. Most participants had between 2 and 5 years of experience, accounting for about 35% (68), followed by those with less than 2 years of experience at approximately 32% (63). Participants with 6–9 years of experience accounted for about 20% (39), while those with more than 10 years of experience accounted for approximately 14% (27); the majority of stakeholders had between 2 and 5 years of work experience.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Finally, approximately 49% of participants held a B.Sc./HND (96), 21% held a master's degree (42), 19% held a secondary school certificate (38), and 11% held a PhD (21).</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Descriptive Summary</em></strong></span></p><p><span style="font-family: Calibri, sans-serif;"><strong>Table 2: Effect of Financial Reporting Misconduct on Abandoned Urban Transport Projects</strong></span></p><table style="min-width: 175px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>#</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Measurement item</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SA (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>A (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>UN (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>D (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SD (%)</strong></span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">1</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Considering your complete knowledge about Financial Reporting Misconduct and its benefits, would you agree that it contributes to the abandonment of urban transport projects such as the Rivers Monorail?</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">92 (47%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">73 (37%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12 (6%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12 (6%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08 (4%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">2</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">I believe that inaccurate and misleading financial reporting leads to poor financial decision-making during the implementation of urban transport projects.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">121 (61%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">42 (21%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">09 (5%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">15 (8%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">10 (5%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">I believe that poor financial reporting practices reduce accountability and transparency, thereby increasing the likelihood of abandoning urban transport projects.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">95 (48%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">77 (39%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">05 (3%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08 (4%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12 (6%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">4</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">There is a need for improved financial reporting standards and monitoring mechanisms to reduce the abandonment of urban transport projects in Nigeria.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">75 (38%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">107 (54%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">06 (3%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">04 (2%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">05 (3%)</span></p></td></tr></tbody></table><p><span style="font-size: 9pt; font-family: Calibri, sans-serif;"><em>Source: Field survey, 2026.</em></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">From Table 2, when respondents were asked whether, considering their complete knowledge about Financial Reporting Misconduct, they agreed that it contributes to the abandonment of urban transport projects such as the Rivers Monorail, 92 (47%) strongly agreed, 73 (37%) agreed, 12 (6%) were undecided, 12 (6%) disagreed, while 8 (4%) strongly disagreed. This indicates that the majority of respondents agreed that financial reporting misconduct contributes significantly to the abandonment of urban transport projects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">On whether inaccurate and misleading financial reporting leads to poor financial decision-making during the implementation of urban transport projects, 121 (61%) strongly agreed, 42 (21%) agreed, 9 (5%) were undecided, 15 (8%) disagreed, while 10 (5%) strongly disagreed. The overwhelming number of respondents who strongly agreed and agreed implies that inaccurate financial reporting is perceived as a major factor influencing poor financial decisions during project execution.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">On whether poor financial reporting practices reduce accountability and transparency, thereby increasing the likelihood of abandonment, 95 (48%) strongly agreed, 77 (39%) agreed, 5 (3%) were undecided, 8 (4%) disagreed, while 12 (6%) strongly disagreed. Since the majority of respondents either strongly agreed or agreed, it can be inferred that poor financial reporting practices contribute significantly to ineffective financial management, thereby increasing the likelihood of project abandonment.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Finally, when respondents were asked whether there is a need for improved financial reporting standards and monitoring mechanisms to reduce the abandonment of urban transport projects in Nigeria, 75 (38%) strongly agreed, 107 (54%) agreed, 6 (3%) were undecided, 4 (2%) disagreed, while 5 (3%) strongly disagreed. Based on these responses, it can be concluded that an overwhelming majority of respondents believe that strengthening financial reporting standards and monitoring mechanisms is essential for reducing the abandonment of urban transport projects in Nigeria.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong>Table 3: Effect of Internal Control on Abandoned Urban Transport Projects</strong></span></p><table style="min-width: 175px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>#</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Measurement item</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SA (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>A (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>UN (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>D (%)</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SD (%)</strong></span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">1</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">I think there is a need for effective internal control systems to minimize the abandonment of urban transport projects in Nigeria.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">84 (42%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">89 (45%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08 (4%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">05 (3%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11 (6%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">2</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">The Rivers State Government has effective internal control mechanisms in place to ensure accountability in the execution of urban transport projects.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">20 (10%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">27 (14%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11 (6%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">73 (37%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">66 (34%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Effective monitoring and supervision of project funds through internal control have contributed to the successful completion of urban transport projects in Nigeria.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">52 (26%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">63 (32%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">21 (11%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">32 (16%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">29 (15%)</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">4</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">Strong internal control systems contribute significantly to reducing financial mismanagement and preventing the abandonment of urban transport projects.</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">101 (51%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">77 (39%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">0 (0%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">09 (5%)</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">10 (5%)</span></p></td></tr></tbody></table><p><span style="font-size: 9pt; font-family: Calibri, sans-serif;"><em>Source: Field survey, 2026.</em></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">From Table 3, when respondents were asked whether they think there is a need for effective internal control systems to minimize the abandonment of urban transport projects in Nigeria, 84 (42%) strongly agreed, 89 (45%) agreed, 8 (4%) were undecided, 5 (3%) disagreed, while 11 (6%) strongly disagreed. This affirms that the majority of respondents believe that effective internal control systems are necessary to minimize the abandonment of urban transport projects in Nigeria.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">On whether the Rivers State Government has effective internal control mechanisms in place to ensure accountability in the execution of urban transport projects, 20 (10%) strongly agreed, 27 (14%) agreed, 11 (6%) were undecided, while 73 (37%) disagreed and 66 (34%) strongly disagreed. The high proportion of respondents who disagreed and strongly disagreed indicates that the Rivers State Government lacks effective internal control mechanisms for ensuring accountability in the implementation of urban transport projects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">On whether effective monitoring and supervision of project funds through internal control have contributed to the successful completion of urban transport projects in Nigeria, 52 (26%) strongly agreed, 63 (32%) agreed, 21 (11%) were undecided, 32 (16%) disagreed, while 29 (15%) strongly disagreed. Since the majority of respondents strongly agreed and agreed, it can be inferred that effective monitoring and supervision of project funds through internal control contribute significantly to the successful completion of urban transport projects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Finally, when respondents were asked whether strong internal control systems contribute significantly to reducing financial mismanagement and preventing the abandonment of urban transport projects, 101 (51%) strongly agreed, 77 (39%) agreed, none were undecided, 9 (5%) disagreed, while 10 (5%) strongly disagreed. Based on these responses, it can be concluded that an overwhelming majority of respondents agreed that strong internal control systems play a significant role in reducing financial mismanagement and preventing the abandonment of urban transport projects.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Hypothesis Testing</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>Hypothesis One</strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">H₀₁: There is no significant effect of Financial Reporting Misconduct on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong>Table 4: Chi-Square Test for the Effect of Financial Reporting Misconduct on Abandoned Urban Transport Projects</strong></span></p><table style="min-width: 275px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Item</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SA</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>A</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>UN</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>D</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SD</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Mean</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Std. Dev.</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>χ²</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Sig.</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Df</strong></span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">A1</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">92</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">73</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3.88</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">0.0319</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">18.07</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">0.025</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">A2</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">121</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">42</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">09</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">15</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">10</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">A3</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">95</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">77</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">05</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">A4</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">75</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">107</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">06</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">04</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">05</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr></tbody></table><p><span style="font-size: 9pt; font-family: Calibri, sans-serif;"><em>Source: Field survey, 2026.</em></span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong><em>Interpretation and decision</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The result of the chi-square (χ²) test on the effect of Financial Reporting Misconduct on Abandoned Urban Transport Projects is presented in Table 4. The mean score of this proposition is 3.88, with a standard deviation of 0.0319. The χ² value of 18.07, with a p-value of 0.025, is significant at the 5% level of significance. Since the p-value (0.025) is less than the significance level of 0.05, the null hypothesis (H₀₁) is rejected. The study therefore concludes that Financial Reporting Misconduct has a significant effect on Abandoned Urban Transport Projects, particularly with reference to the Rivers Monorail project. This finding suggests that poor financial reporting practices, including inaccurate financial statements, lack of transparency, and financial irregularities, contribute significantly to the abandonment of urban transport projects by undermining accountability, distorting financial decision-making, and weakening effective project implementation.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>Hypothesis Two</strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">H₀₂: There is no significant effect of Internal Control on Abandoned Urban Transport Projects: A Case Study of the Rivers Monorail.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong>Table 5: Chi-Square Test for the Effect of Internal Control on Abandoned Urban Transport Projects</strong></span></p><table style="min-width: 275px;"><colgroup><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"><col style="min-width: 25px;"></colgroup><tbody><tr><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Item</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SA</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>A</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>UN</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>D</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>SD</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Mean</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Std. Dev.</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>χ²</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Sig.</strong></span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="color: white; font-size: 8pt; font-family: Calibri, sans-serif;"><strong>Df</strong></span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">1</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">84</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">89</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">08</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">5</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3.811</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">0.916</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">12.44</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">0.031</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3</span></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">2</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">20</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">27</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">11</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">73</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">66</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">3</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">52</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">63</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">21</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">32</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">29</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr><tr><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">4</span></p></td><td colspan="1" rowspan="1"><p><span style="font-size: 8pt; font-family: Calibri, sans-serif;">101</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">77</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">–</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">9</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"><span style="font-size: 8pt; font-family: Calibri, sans-serif;">10</span></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td><td colspan="1" rowspan="1"><p style="text-align: center;"></p></td></tr></tbody></table><p><span style="font-size: 9pt; font-family: Calibri, sans-serif;"><em>Source: Field survey, 2026.</em></span></p><p style="text-align: justify;"></p><p style="text-align: justify;"></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong><em>Interpretation and decision</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The result of the chi-square (χ²) test on the effect of Internal Control on Abandoned Urban Transport Projects is presented in Table 5. The mean score of this proposition is 3.811, with a standard deviation of 0.916. The χ² value of 12.44, with a p-value of 0.031, is significant at the 5% level of significance. Since the p-value (0.031) is less than the significance level of 0.05, the null hypothesis (H₀₂) is rejected.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The study therefore concludes that Internal Control has a significant effect on Abandoned Urban Transport Projects, with particular reference to the Rivers Monorail project. This finding indicates that effective internal control systems, including proper monitoring, financial oversight, accountability mechanisms, and regular supervision of project funds, play a significant role in minimizing financial mismanagement and reducing the incidence of abandoned urban transport projects.</span></p><p><span style="font-family: Calibri, sans-serif;"><strong><em>Discussion of Findings</em></strong></span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The aim of this study was to analyze the effect of financial mismanagement on abandoned urban transport projects, with particular reference to the Rivers Monorail project in Rivers State, Nigeria. Specifically, the study sought to examine the effect of financial reporting misconduct and internal control on abandoned urban transport projects. A descriptive research design was adopted, and the chi-square (χ²) statistical technique was employed to analyze the data collected from respondents. The findings of the first hypothesis revealed that, at the 5% level of significance, Financial Reporting Misconduct has a significant effect on Abandoned Urban Transport Projects, as evidenced by a mean of 3.88, standard deviation of 0.0319, χ² of 18.07, and p-value of 0.025. This finding suggests that inaccurate financial reporting, lack of transparency, and financial irregularities contribute significantly to poor financial decision-making and ultimately to the abandonment of major urban transport projects such as the Rivers Monorail. The finding is consistent with previous studies emphasizing that weak financial reporting practices reduce accountability, encourage the misapplication of public funds, and undermine the successful completion of public infrastructure projects.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">The findings of the second hypothesis also indicated that Internal Control has a significant effect on Abandoned Urban Transport Projects, with a mean of 3.811, standard deviation of 0.916, χ² of 12.44, and p-value of 0.031. This result implies that effective internal control systems — including proper monitoring, financial oversight, supervision, and accountability mechanisms — are essential for ensuring prudent utilization of project funds and minimizing the abandonment of urban transport projects. Conversely, weak internal control systems increase the risk of financial mismanagement, project delays, cost overruns, and eventual project abandonment.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Overall, the study concludes that financial mismanagement, as reflected through financial reporting misconduct and weak internal control systems, significantly contributes to the abandonment of urban transport projects in Nigeria. Therefore, strengthening financial reporting standards, improving internal control mechanisms, enhancing transparency, and enforcing accountability in public infrastructure financing are essential for reducing abandoned projects and ensuring the successful delivery of urban transport infrastructure.</span></p><h1><span style="font-family: Calibri, sans-serif;">Conclusion</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">In conclusion, this study underscores that financial mismanagement is a primary catalyst for the abandonment of large-scale urban transport infrastructure. By examining the ill-fated Rivers Monorail project, the research provides empirical evidence that the collapse of such megaprojects is rarely due to technical flaws alone, but is deeply rooted in systemic financial failures. Specifically, the findings reveal that financial reporting misconduct has a significant effect on abandoned urban transport projects. In the case of the Rivers Monorail, the deliberate obfuscation of financial realities — whether through inflated costs, misrepresentation of project liquidity, or the omission of contingent liabilities — created a false narrative of progress. This misconduct severed the crucial link between project execution and fiduciary accountability, ultimately misleading stakeholders and eroding the fiscal trust required to sustain long-term infrastructure funding.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Equally critical is the finding that internal control mechanisms have a significant effect on project abandonment. The Rivers Monorail case vividly demonstrates that a profound weakness in internal controls — characterized by a lack of independent oversight, poor procurement auditing, and the absence of checks on executive discretion — created an environment where financial hemorrhage could go unchecked. Without robust internal controls, funds were systematically misappropriated or misallocated, draining the project's financial lifeline long before physical completion could be realized.</span></p><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Ultimately, the abandonment of the Rivers Monorail serves as a stark cautionary tale regarding the intersection of governance and infrastructure. Financial reporting misconduct and weak internal controls do not merely operate as isolated administrative failures; they act as compounding variables that inevitably spiral a viable urban transport project into insolvency and abandonment. To prevent the recurrence of such “white elephant” projects in the future, it is imperative that government agencies and project administrators move beyond mere technical planning. Policymakers must enforce stringent, real-time financial reporting standards and institute independent, robust internal control systems. Only by prioritizing financial transparency and rigorous accountability can urban transport projects successfully transition from ambitious blueprints to completed, functioning public assets.</span></p><h1><span style="font-family: Calibri, sans-serif;">Recommendation</span></h1><p style="line-height: 108%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Based on the empirical findings that financial reporting misconduct and weak internal controls significantly contributed to the abandonment of the Rivers Monorail project, the following recommendations are proposed to safeguard current and future urban transport infrastructure from a similar fate:</span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>i. </strong>Government agencies must enforce routine, independent forensic audits at every phase of large-scale transport projects, rather than relying solely on year-end financial statements. This will deter the manipulation of project costs, inflation of contracts, and concealment of financial distress.</span></p><p style="text-align: justify;"><span style="font-family: Calibri, sans-serif;"><strong>ii. </strong>The Rivers Monorail case highlights the danger of concentrated power. There must be a strict separation of duties among those who authorize payments, those who disburse funds, and those who record transactions. No single individual or department should control the entire financial lifecycle of a project.</span></p><h1><span style="font-family: Calibri, sans-serif;">References</span></h1><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Arens, A. A., Elder, R. J., & Beasley, M. S. (2020). <em>Auditing and assurance services: An integrated approach</em> (17th ed.). Pearson.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Ashbaugh-Skaife, H., Collins, D. W., Kinney, W. R., Jr., & LaFond, R. (2008). The effect of SOX internal control deficiencies and their remediation on accrual quality. <em>The Accounting Review</em>, 83(1), 217–250.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Auditor-General South Africa. (2023). <em>Integrated annual report 2022–23.</em> Auditor-General South Africa.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Beasley, M. S., Carcello, J. V., Hermanson, D. R., & Neal, T. L. (2010). Fraudulent financial reporting: Consideration of industry traits and corporate governance mechanisms. <em>Accounting Horizons</em>, 24(2), 157–179.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Cantarelli, C. C., Flyvbjerg, B., Molin, E. J. E., & van Wee, B. (2012). Characteristics of cost overruns for Dutch transport infrastructure projects and the importance of the decision to build and project phases. <em>Transport Policy</em>, 22, 49–56.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Dechow, P. M., Sloan, R. G., & Sweeney, A. P. (1996). Causes and consequences of earnings manipulation: An analysis of firms subject to enforcement actions by the SEC. <em>Contemporary Accounting Research</em>, 13(1), 1–36.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Dechow, P. M., Ge, W., & Schrand, C. M. (2010). Understanding earnings quality: A review of the proxies, their determinants and their consequences. <em>Journal of Accounting and Economics</em>, 50(2–3), 344–401.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">DiMaggio, P. J., & Powell, W. W. (1983). The iron cage revisited: Institutional isomorphism and collective rationality in organizational fields. <em>American Sociological Review</em>, 48(2), 147–160.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Doloi, H., Sawhney, A., Iyer, K. C., & Rentala, S. (2012). Analysing factors affecting delays in Indian construction projects. <em>International Journal of Project Management</em>, 30(4), 479–489.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Ewa, U. E., Udo, G. E., & Awa, H. O. (2018). Causes and effects of abandoned government projects in Nigeria. <em>International Journal of Business and Management</em>, 13(6), 99–109.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Feng, M., Li, C., & McVay, S. (2009). Internal control and management guidance. <em>Journal of Accounting and Economics</em>, 48(2–3), 190–209.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Flyvbjerg, B. (2014). What you should know about megaprojects and why: An overview. <em>Project Management Journal</em>, 45(2), 6–19.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Glasser, M., & Wright, J. (2020). South African municipalities in financial distress: What can be done? <em>Journal of Law, Democracy and Development</em>, 24, 413–441.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Hall, J. A. (2019). <em>Accounting information systems</em> (10th ed.). Cengage Learning.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Hayes, R., Dassen, R., Schilder, A., & Wallage, P. (2020). <em>Principles of auditing: An introduction to international standards on auditing</em> (4th ed.). Pearson.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Healy, P. M., & Palepu, K. G. (2001). Information asymmetry, corporate disclosure, and the capital markets: A review of the empirical disclosure literature. <em>Journal of Accounting and Economics</em>, 31(1–3), 405–440.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Idoro, G. I. (2020). Mitigating the causes of project abandonment in developing economies: The role of the quantity surveyor. <em>Journal of Construction Project Management and Innovation</em>, 10(1), 1–15.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">International Federation of Accountants. (2021). <em>International framework: Good governance in the public sector.</em> IFAC & CIPFA.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">International Organization of Supreme Audit Institutions. (2019). <em>INTOSAI guidance for good governance: Internal control standards for the public sector.</em> INTOSAI.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Kerzner, H. (2022). <em>Project management: A systems approach to planning, scheduling, and controlling</em> (13th ed.). Wiley.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Mabunda, L. T., Mvunabandi, J. D., & Chonco, C. M. (2023). Investigating the effect of financial mismanagement on municipalities' service delivery: A case study of eThekwini Municipality, South Africa. <em>Journal of Accounting and Finance in Emerging Economies</em>, 9(4), 639–654.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Makanyeza, C., Chitambara, T. L., & Kakava, N. Z. (2018). Does corporate social responsibility influence firm performance? Empirical evidence from Harare, Zimbabwe. <em>Journal of African Business</em>, 19(2), 155–173.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Meredith, J. R., Shafer, S. M., & Mantel, S. J., Jr. (2022). <em>Project management: A strategic managerial approach</em> (11th ed.). Wiley.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Messier, W. F., Glover, S. M., & Prawitt, D. F. (2022). <em>Auditing and assurance services: A systematic approach</em> (12th ed.). McGraw-Hill Education.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Meyer, J. W., & Rowan, B. (1977). Institutionalized organizations: Formal structure as myth and ceremony. <em>American Journal of Sociology</em>, 83(2), 340–363.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Mikesell, J. L. (2018). <em>Fiscal administration: Analysis and applications for the public sector</em> (10th ed.). Cengage Learning.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Nicholas, J. M., & Steyn, H. (2020). <em>Project management for engineering, business and technology</em> (6th ed.). Routledge.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">North, D. C. (1990). <em>Institutions, institutional change and economic performance.</em> Cambridge University Press.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Organization for Economic Co-operation and Development. (2023). <em>OECD principles of budgetary governance.</em> OECD Publishing.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Oseghale, G. O., Oghenekevwe, O. E., & Oghenerukewe, E. (2021). Infrastructure deficit and project abandonment in Nigeria: The political economy perspective. <em>African Journal of Science, Technology, Innovation and Development</em>, 13(4), 437–448.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Rezaee, Z. (2005). Causes, consequences, and deterrence of financial statement fraud. <em>Critical Perspectives on Accounting</em>, 16(3), 277–298.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Rivers State Government. (2019). <em>White paper on the report of the Rivers State Judicial Commission of Inquiry into the sale of valued state assets and other related matters</em> (Official Government Publication). Port Harcourt, Rivers State.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Scott, W. R. (2014). <em>Institutions and organizations: Ideas, interests, and identities</em> (4th ed.). SAGE Publications.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">Sotubo, L. (2020, September 12). Rivers Monorail: A monument of shame and waste. <em>Premium Times</em>.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">United Nations Human Settlements Programme. (2022). <em>World cities report 2022: Envisaging the future of cities.</em> UN-Habitat.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">World Bank. (2017). <em>Reducing inequalities in water supply, sanitation, and hygiene in the era of the SDGs: Synthesis report of the Water Supply, Sanitation, and Hygiene (WASH) Poverty Diagnostic Initiative.</em> World Bank Group.</span></p><p style="line-height: 115%; text-align: justify;"><span style="font-family: Calibri, sans-serif;">World Bank. (2023). <em>Connecting to thrive: Challenges and opportunities for transport infrastructure in developing economies.</em> World Bank.</span></p><p><span style="font-size: 10pt; font-family: Calibri, sans-serif;">Yescombe, E. R. (2018). <em>Public-private partnerships in infrastructure: Principles of policy and finance</em> (2nd ed.). Butterworth-Heinemann.</span></p>